SHOP

Price reductions on selected cars, from £250 - £1000 off

Diesel Renault Megane for sale

Renault Megane

  • 2019
  • 55,772 miles
  • Diesel
  • Manual

£9,099

Renault Megane1.5 Blue dCi 115 Iconic 5dr

  • 2019

  • 55,772 miles

  • Diesel

  • Manual

£800 worth of extra features included with this car

Car Overview

Mechanical
Transmission
Manual
Mileage
55,772
Engine
1.5L
Fuel
Diesel
Drive type
Front-wheel drive
Trim
Body
Estate
Colour
BLUE
Doors
5
Seats
5
Service history
Last service
21/02/2025
Mileage at last service
55,771
Running costs
Fuel consumption
61MPG (around £22 a week)
Tax
£190 a year (around £16.63 a month)
Insurance group
16E
Useful information
Previous owners
1
Insurance group
16E
Vehicle registration
SH19EVM
ULEZ compliant
Yes

£0 /month

Hire Purchase

Representative example*

Get your part-exchange quote

Enter your registration

 

*Personal Contract Purchase (PCP) representative example: Based on a cash price of £12,550, with a £2,000 customer deposit, borrowing £10,550 at a representative APR of 11.4%. 48 monthly payments of £194.03. Fixed rate of interest per annum 5.93%. Optional final payment £5,005.00. Option-to-purchase fee £10. Amount of interest £3,768.44. Total amount payable £16,318.44. Annual mileage limit 8,000 miles. Excess mileage charge 4p per mile.

Key features include

Extra features included with this car

This car has 3 extra features, added when it was new.

Worth £800 when the car was new

  • Renault i.d. metallic paint

    £650

  • Emergency spare wheel

    £150

  • Cosmos Blue metallic

    £0

The extra features listed are those fitted by the manufacturer to the car when it was new over and above the standard specification for this model. The values displayed represent the manufacturer’s list price for each fitted feature at the time the car was new. Features may have been altered or removed and depreciated since the car was new. If you have any questions relating the specifications of the car then please contact us.

Finance calculator

Sorry, we've sold this car.

Finding the minimum deposit...

 

Average mileage is around 10,000 per year

 

This helps you get a more accurate finance estimate

Not sure about being approved?

Check finance eligibility

Won't affect your credit score

Your estimated examples

These estimates are subject to credit checks, and may change if you do apply for finance.

Price of car
£0
Total deposit
£0
  • 0 monthly payments of

    £0

  • Example APR 0%
  • Option-to-purchase

    £0

  • Amount of interest
    £0
  • Total amount payable
    (including deposit)
    £0

Hire Purchase (HP)

Usually has higher monthly payments compared to PCP, but the car will belong to you at the end of your finance term.View full HP finance (PDF)

Our trusted lenders include:

  • Black Horse
  • Evolution Funding
  • Moto Novo Finance
  • Santander Consumer Finance

Car Care

A range of products to keep your car on the road and a smile on your face

Choose from a selection of insurance products, provided by our friends at Assurant.

Extended warranty

Get comfort from knowing you're covered for a wide variety of mechanical and electrical faults. Extended warranty starts when your free cinch 90-day warranty ends.

Read more about extended warranty

Scratch and dent insurance

Protect yourself against the cost of repairing small scratches, dents and chips. A cosmetic specialist will visit you to get your bodywork back looking its best.

Read more about scratch and dent insurance

Alloy wheel insurance

If you accidentally kerb your wheel or find it damaged, a skilled technician will visit you to repair it. If it’s beyond repair, you’ll be reimbursed up to £150 (plus VAT) when you buy a new one.

Read more about alloy wheel insurance

Tyre insurance

Cover for tyre repairs and replacements if the worst happens. Unlimited puncture repairs (up to £50 each) and claim for up to 15 replacement tyres worth from £100 to £500 (depending on the cover you choose).

Read more about tyre insurance

Buy with confidence

We’ve created a quality journey from beginning to end, so you can bag your perfect car and rest easy.

Our quality commitment

Every car is thoroughly inspected in line with our vehicle standards, and carefully reconditioned, by technical experts. We are completely transparent about any imperfections and flag them clearly on the images of the car. But no used car is perfect so you should expect some general wear and tear for the car’s age and mileage that may not be visible in photos.

people getting in car

Included with every car

To make sure you’re 100% happy and confident we offer the following as standard with every car:

  • at a time and place that suits you
  • Free 90-day warranty with breakdown assistance
  • Minimum 6-month MOT and service history
polishing car